My Broadsheet > Government > A New Home for Howe’s Playground

A New Home for Howe’s Playground

The former site of Howe School’s playground.

Howe School’s new playground has a new home. According to the revised site plan by project architect Miller Dunwiddie, the playground will be set back from the school’s property line 20 feet to comply with city zoning. As noted in a previous article, space is hard to come by at Howe School, however, the architect appears to have found a location that does not interfere with the soccer and baseball fields and does not get too close to the loading and unloading docks. The play structure will be rectangular and slightly smaller than the previous space. It will have a rubberized surface for safety.

Jane Thompson, MPS Project Specialist for the Howe renovation, notes that moving the play structure location is anticipated to increase construction costs by $70,000 to $80,000. Minneapolis Public Schools had recently withdrawn its variance request to locate the new play area in the existing location after being advised that cost would not be reason enough for the city to approve a variance.

The revised site plan for Howe School

The updated site plan for Howe School. Note the new location of the playground, 20 feet from the school’s property line. Image courtesy of Minneapolis Public Schools.

 

Comments are closed.

© 2013 My Broadsheet. Powered by WordPress. Editor by AWESEM.

Back to top.